Thursday, 26 June 2025 »  Login
in
»
I am at

2 Months For Layout, Building Regularisation In TS

The TS govt offered to regularize lands and buildings in the HMDA, GHMC and other limits under the illegal occupation of people, in the next two months.
Hyderabad | 2nd November 2015
The Telangana government today offered to allow applications for the regularization of lands and buildings in the HMDA, GHMC and other limits under the illegal occupation of people, in the next two months.

The process of regularization will be complete in six months.

While slum-dwellers can pay a meagre amount of Rs 5 per sq yard, others have to pay more.

The regularization is likely to fetch Rs 1,000 crores in revenue for the government, it is learnt.

The regularization was meant for the welfare of the poor and slum-dwellers, who could get their lands and structures legally registered in their own names, Commercial Taxes minister T Srinivas Yadav said at a press conference at the Secretariat on Monday.

Yadav headed a committee on the issue and Chief Minister K Chandrashekar Rao had approved its recommendations.

Yadav said that the regularization was good news for people, and that they needed to apply online by paying Rs 10,000.

Penal action would be taken against those who did not make use of the window, he warned.

Layouts, plots and buildings or structures illegally occupied as of October 28 will be considered for regularization.

Building regularization charges are Rs 12,500 for areas of upto 600 sq mt, Rs 25,000 for areas from 601 to 1,200 sq mt, Rs 40,000 for 1201-2000 sq mt, and Rs 60,000 for 2,000 sq mt and above. The charges vary for domestic and commercial buildings.

Layout and plot regularization charges are Rs 200 for areas upto 100 sq mt, Rs 400 for 101-200 sq mt, Rs 600 for 301-500 sq mt and Rs 750 for 500 sq mt and above. The charges are Rs 5 per sq mt in slums.

Layouts made and buildings occupied illegally after October 28 will face criminal cases and action through the enforcement wing after the cut-off date of October 28.
filed in:  Land Regularisation, Building Regularization, Talasani Srinivas Yadav, Telangana
COMMENTS
1 - 1 OF 1 COMMENTS
POSITIVE  |  NEGATIVE |  NEWEST  |  OLDEST  |  MOST HELPFUL  |  LEAST HELPFUL
kvnarayana. Senior citizen& on 30th Nov 2015, 10:52pm | Permalink
Lrs scheame Go no 151 Dt 02/11/2015 was notified in Gazette on 3/11/2015.and fixed the cut of date as 28/10/2015 on whose name the title exists.What about the people who bought such plots before the notification of this GO ie in between 29/10/2015 to 2/11/2015. Suggest some solution for the people who transacted during the above period where there is no Go at all and public are not aware of the contents of Go such as cut of date etc.So I appeal to the Honble Authorities to kindly extend the CUTT OFF DATE as 3/11/2015 ie the date of notification in the Gazette.By that the public who transacted in between the date ie 28/10/2015 and the date of the GO ie 2/11/2015 will not be deprived of the facility of appling and more over this will aiso augment to the exchequer of the Government.
LEAVE A COMMENT
fullhyd.com has 700,000+ monthly visits. Tell Hyderabad what you feel about 2 Months For Layout, Building Regularisation In TS!
[no link to your name will appear, overriding global settings]
To preserve integrity, fullhyd.com allows ratings/comments only with a valid email. Your comments will be accepted once you give your email, and will be deleted if the email is not authenticated within 24 hours.
My name:

Dissatisfied with the results? Report a problem or error, or add a listing.
ADVERTISEMENT
SHOUTBOX!
{{todo.name}}
{{todo.date}}
[
]
{{ todo.summary }}... expand »
{{ todo.text }} « collapse
First  |  Prev  |   1   2  3  {{current_page-1}}  {{current_page}}  {{current_page+1}}  {{last_page-2}}  {{last_page-1}}  {{last_page}}   |  Next  |  Last
{{todos[0].name}}

{{todos[0].text}}

ADVERTISEMENT
This page was tagged for
INSRTRUCTION OF HMDA XOMMISSINERUNDER GO 151 DT 2/11/2015
lrs go 151 2/11/2015
bulding regularise scheme in ghmc 2016
ts gov lrs go 151
HMDA land regularisation extenssion cut of date
Follow fullhyd.com on
Copyright © 2023 LRR Technologies (Hyderabad) Pvt Ltd. All rights reserved. fullhyd and fullhyderabad are registered trademarks of LRR Technologies (Hyderabad) Pvt Ltd. The textual, graphic, audio and audiovisual material in this site is protected by copyright law. You may not copy, distribute or use this material except as necessary for your personal, non-commercial use. Any trademarks are the properties of their respective owners.