Friday, 25 April 2025 »  Login
in
»
I am at

Polavaram Already Cleared: Jairam

Environmental clearance to the Polavaram was granted on 10 October 2005 after following the due procedure, says the minister.
Hyderabad | 30th November 2010
Minister of State for Environment and Forests (Independent Charge) Jairam Ramesh on Monday stated that environmental clearance to the Indira Sagar Project (Polavaram Multipurpose Project) in Andhra Pradesh was granted on 10 October 2005 after following the due procedure as under the Environment Impact Assessment Notification, 1994.

In a written reply to a question posed by KVP Ramachandra Rao in the Rajya Sabha, Ramesh stated that the state government had proposed the construction of embankments on river Sileru and Saberi in Chhattisgarh and Orissa to avoid submergence in these states, which were not considered during the grant of the Environmental Clearance in 2005.

The construction of embankments in Orissa and Chhattisgarh requires public hearing under the provisions of the Environment Impact Assessment Notification, 2006.

Public hearings have not been conducted in Orissa and Chattisgarh because the governments of these states have objected to a construction of the Indira Sagar Project, he stated.

Courtesy: INN
filed in:  Environment, Polavaram Project
COMMENTS
Be the first to comment on Polavaram Already Cleared: Jairam! Just use the simple form below.
LEAVE A COMMENT
fullhyd.com has 700,000+ monthly visits. Tell Hyderabad what you feel about Polavaram Already Cleared: Jairam!
[no link to your name will appear, overriding global settings]
To preserve integrity, fullhyd.com allows ratings/comments only with a valid email. Your comments will be accepted once you give your email, and will be deleted if the email is not authenticated within 24 hours.
My name:

Dissatisfied with the results? Report a problem or error, or add a listing.
ADVERTISEMENT
SHOUTBOX!
{{todo.name}}
{{todo.date}}
[
]
{{ todo.summary }}... expand »
{{ todo.text }} « collapse
First  |  Prev  |   1   2  3  {{current_page-1}}  {{current_page}}  {{current_page+1}}  {{last_page-2}}  {{last_page-1}}  {{last_page}}   |  Next  |  Last
{{todos[0].name}}

{{todos[0].text}}

ADVERTISEMENT
This page was tagged for
environmental clearance for movie theaters
Environment Clearance for Polavaram Irrigation Project
indira sagar polavaram project
ENVIRONMENTAL CLEARANCE IN POLLAVARAM
status of environmental clearance to polavaram project
Follow fullhyd.com on
Copyright © 2023 LRR Technologies (Hyderabad) Pvt Ltd. All rights reserved. fullhyd and fullhyderabad are registered trademarks of LRR Technologies (Hyderabad) Pvt Ltd. The textual, graphic, audio and audiovisual material in this site is protected by copyright law. You may not copy, distribute or use this material except as necessary for your personal, non-commercial use. Any trademarks are the properties of their respective owners.