Wednesday, 25 June 2025 »  Login
in
»
I am at

HMR Authorities Still Unclear On Metro Routes

Despite repeated objections raised by KCR over the present route, the Telangana Government has not conveyed its stand on the issue to the HMR authorities.
Hyderabad | 21st December 2014
The Hyderabad Metro Rail authorities are in a state of confusion over the re-alignment of the Metro Rail route at certain places including the Assembly, Sultan Bazar and Old City.

Despite repeated objections raised by Chief Minister K Chandrashekar Rao over the present route, the Telangana Government, according to sources, has not conveyed its stand on the issue to the HMR authorities.

The government could not take a decision despite holding an all-Party meeting twice.

Amid this confusion, the HMR authorities are unable to decide whether or not to proceed with the existing design of the Metro Rail project.

The HMRL is expecting an increase in cost by nearly Rs 3,000 crores if the present alignment is changed. Further, the changes are likely to cause heavy revenue loss to the L&T HMRL as it would have to drop a few stations from the list. These include the proposed stations at Assembly and Sultan Bazar, and along the entire route in the Old City, although they will be replaced with other stations.

The State Government, according to sources, is willing to compensate only about Rs 1,000 crores. The HMR authorities want to negotiate the issue with the government only after receipt of some written orders.

The political Parties are divided over the issue. While the Congress wants no changes in the route, the TDP and BJP want the HMR to go ahead with the original route in the Old City. The MIM is strongly demanding a complete change in the alignment in the Old City in order to prevent the relocation of about 40 places of worship, including seven heritage structures, and about 1,200 private properties.

For now, the HMR authorities have reportedly decided to focus on the completion of works in other areas which are currently not under dispute. (INN)
filed in:  Hyderabad Metro Rail, Metro Rail, Railways
COMMENTS
Be the first to comment on HMR Authorities Still Unclear On Metro Routes! Just use the simple form below.
LEAVE A COMMENT
fullhyd.com has 700,000+ monthly visits. Tell Hyderabad what you feel about HMR Authorities Still Unclear On Metro Routes!
[no link to your name will appear, overriding global settings]
To preserve integrity, fullhyd.com allows ratings/comments only with a valid email. Your comments will be accepted once you give your email, and will be deleted if the email is not authenticated within 24 hours.
My name:

Dissatisfied with the results? Report a problem or error, or add a listing.
ADVERTISEMENT
SHOUTBOX!
{{todo.name}}
{{todo.date}}
[
]
{{ todo.summary }}... expand »
{{ todo.text }} « collapse
First  |  Prev  |   1   2  3  {{current_page-1}}  {{current_page}}  {{current_page+1}}  {{last_page-2}}  {{last_page-1}}  {{last_page}}   |  Next  |  Last
{{todos[0].name}}

{{todos[0].text}}

ADVERTISEMENT
This page was tagged for
hyderabad December 2014 News
Hyderabad Metro Rail news
Metro Rail updates
Follow fullhyd.com on
Copyright © 2023 LRR Technologies (Hyderabad) Pvt Ltd. All rights reserved. fullhyd and fullhyderabad are registered trademarks of LRR Technologies (Hyderabad) Pvt Ltd. The textual, graphic, audio and audiovisual material in this site is protected by copyright law. You may not copy, distribute or use this material except as necessary for your personal, non-commercial use. Any trademarks are the properties of their respective owners.