Tuesday, 8 April 2025 »  Login
in
»
I am at

Mir Alam Tank Beautification By January 2015

GHMC Commissioner Somesh Kumar said that the Tank would be developed on the lines of the Hussain Sagar Lake, at a cost of Rs 45 crores.
Hyderabad | 19th June 2014
GHMC Commissioner Somesh Kumar said that the Mir Alam Tank would be developed on the lines of the Hussain Sagar Lake.

Speaking after inspecting the Mir Alam Tank on Thursday, the Commissioner said that Rs 45 crores would be spent for the overall development of the historic tank.

The Commissioner said that the GHMC Council had already sanctioned an amount of Rs 5 crores for the project, and the GHMC was planning to get further funds sanctioned for its beautification projects in the next meeting of the Council.

The people of the Old City would see a visible change in the coming months, he added, with the GHMC planning to develop the Mir Alam Tank in a very big way since the people of the Old City did not have facilities for walking, cycling, jogging tracks etc.

In the first phase, the GHMC will take up works worth Rs 10 crores, which include modules for protection of the lake, an entry plaza, walking and cycling tracks, tree plantation, theme parks, landscaping, island improvement, boating, fountains, illuminations, water quality improvement measures etc., across the stretch of the entire Mir Alam Tank Circle of around 7 kilometers. These works will be completed in about 3 months.

The Mir Alam Tank will have 3 entrance gates - one from Bahadurpura, one from the No. 9 lane, and a third from the Rajendranagar Circle.

The GHMC is also planning to lay a separate road for the nearby residents of Mir Alam Tank.

The Commissioner said that a special consultant would be appointed after the completion of the first phase to take up the project in a big way, and the GHMC's goal was to make the Tank fully functional by January 2015. (INN)
filed in:  GHMC, Somesh Kumar, GHMC Commissioner, Hyderabad Beautification
COMMENTS
Be the first to comment on Mir Alam Tank Beautification By January 2015! Just use the simple form below.
LEAVE A COMMENT
fullhyd.com has 700,000+ monthly visits. Tell Hyderabad what you feel about Mir Alam Tank Beautification By January 2015!
[no link to your name will appear, overriding global settings]
To preserve integrity, fullhyd.com allows ratings/comments only with a valid email. Your comments will be accepted once you give your email, and will be deleted if the email is not authenticated within 24 hours.
My name:

Dissatisfied with the results? Report a problem or error, or add a listing.
ADVERTISEMENT
SHOUTBOX!
{{todo.name}}
{{todo.date}}
[
]
{{ todo.summary }}... expand »
{{ todo.text }} « collapse
First  |  Prev  |   1   2  3  {{current_page-1}}  {{current_page}}  {{current_page+1}}  {{last_page-2}}  {{last_page-1}}  {{last_page}}   |  Next  |  Last
{{todos[0].name}}

{{todos[0].text}}

ADVERTISEMENT
This page was tagged for
Miralamtank project
Mir Alam Tank Beautification By January 2015
miralam jan audio
mir alam tank project
hyderabad mir alam tank project
Follow fullhyd.com on
Copyright © 2023 LRR Technologies (Hyderabad) Pvt Ltd. All rights reserved. fullhyd and fullhyderabad are registered trademarks of LRR Technologies (Hyderabad) Pvt Ltd. The textual, graphic, audio and audiovisual material in this site is protected by copyright law. You may not copy, distribute or use this material except as necessary for your personal, non-commercial use. Any trademarks are the properties of their respective owners.